Subscribe to updates

You'll receive weekly summaries about Havering Council every week.

If you have any requests or comments please let us know at community@opencouncil.network. We can also provide custom updates on particular topics across councils.

Cabinet - Wednesday, 25th September, 2024 7.30 pm

September 25, 2024 at 7:30 pm Cabinet View on council website

Chat with this meeting

Subscribe to our professional plan to ask questions about this meeting.

“Will Havering's Cabinet discuss specific budget cuts?”

Subscribe to chat
AI Generated

Summary

Open Council Network is an independent organisation. We report on Havering and are not the council. About us

The Cabinet of Havering Council met on Wednesday 25 September 2024 to approve significant procurement contracts for housing maintenance and improvements, and to review the council's first quarter performance report. Key decisions included the approval of contracts totalling hundreds of millions of pounds for major works, electrical services, and compliance services for council housing, alongside plans for the roof replacement at Havering Town Hall.

Large Complex Works and Street Retrofit

The Cabinet approved the procurement of two contracts, with a total value of up to £350 million over 10 years (with an option to extend for a further six years), for major works on council housing and corporate buildings. These contracts will cover large complex block works and street retrofit and internal works. The evaluation criteria were adjusted from the council's default 70% Price: 30% Quality to a MEAT (Most Economically Advantageous Tender) basis of 50% Quality, 40% Price, and 10% Social Value. The procurement will utilise the Mercell portal, managed by Lumensol Limited. Authority to award the contracts and enter into terms post-tender was delegated to the Strategic Director of Place, in consultation with the Lead Member for Housing and other relevant officers.

Havering Town Hall Roof Replacement - Permission to Tender

The Cabinet approved the commencement of a tendering process for the replacement of the roof at Havering Town Hall. The project includes replacing the flat roof and roof lanterns, repairing parapet walls, and installing photovoltaic panels and new HVAC units. The projected start date for the works is June 2025, with completion in December 2025. Authority to award the contract to the successful bidder was delegated to the Director of Place. The report highlighted that the PV panels are projected to generate significant energy savings and reduce carbon emissions.

Compliance Contracts Procurement

Approval was given for the procurement of a suite of six contracts, with an aggregate value of up to £94,050,000 over 10 years (with a six-year extension option), for safety inspections and building compliance checks and works. These contracts will primarily cover council housing but will also include corporate buildings. Similar to other procurement decisions, a waiver was approved to use a 50% Quality, 40% Price, and 10% Social Value weighting, and the Mercell portal will be used for procurement. Authority to award these contracts was delegated to the Strategic Director of Place.

Approval to Award a Contract for Delivery of Electrical Services to HRA Homes and Communal Areas

A contract for electrical services maintenance and renewal, with a total value of up to £63 million over 10 years (with a six-year extension option), was approved for procurement. This contract will cover electrical system maintenance, safety inspections, and renewal services for council housing and corporate buildings. The evaluation criteria were adjusted to a 50% Quality, 40% Price, and 10% Social Value weighting, and the Mercell portal will be used. Authority to award the contract was delegated to the Strategic Director of Place. The report noted the importance of this contract in meeting the council's net zero carbon target by 2040, particularly concerning systems like EV charging and Solar PV.

7 Year Cyclical Decorations Programme

The Cabinet approved the award of a seven-year contract to Trident Maintenance Services Ltd for cyclical decorations and associated repair works to HRA properties, with a maximum value of £20 million. This contract aims to implement a redecoration cycle where all housing blocks are redecorated externally and communal areas internally, and street properties externally, every seven years. Leaseholders were consulted prior to the tender process.

Roof Replacements 2024/25

Approval was given for the procurement of a contract with a total value of up to £4,000,000 for the replacement of roofs to HRA properties. This contract is intended as an interim measure until the end of the financial year 25/26, while a more extensive procurement exercise for longer-term roofing maintenance is undertaken. The works will be carried out on street properties only and are not subject to Section 20 Leasehold consultation. Authority to award the contract was delegated to the Strategic Director of Place.

Corporate Plan 2024-27: Q1 Performance Report (2024/25)

The Cabinet considered and noted the Quarter 1 performance report for the Corporate Plan 2024-27. The report indicated that out of 113 measured Corporate Performance Indicators, 32 had been given a RAG status: 17 were Green (above target), 2 were Amber (below target but within tolerance), and 13 were Red (below target and outside tolerance). The report highlighted that performance delivery is expected to be achieved within existing resources, despite significant financial challenges. The council's overall vision remains The Havering you want to be part of, with three key objectives: Supporting residents to stay safe and well; A great place to live, work and enjoy; and Enabling a resident-focused and resilient Council.

Delegated decisions linked to this meeting

Decision summaries below are AI-generated from the council’s published record. Check the council source or the full decision page before relying on them.

  • Large Complex Works and Street Retrofit
    Recommendations Approved

    ...to procure and award two contracts worth up to £350m for major works on Council housing and corporate buildings, using a 50% Quality, 40% Price, and 10% Social Value weighting, and delegated contract award and works package decisions.

    Council website ↗

  • Roof Replacements 2024/25
    Recommendations Approved

    ...to procure a contract worth up to £4,000,000 for roof replacements on Havering's Housing Revenue Account (HRA) properties, delegating the contract award and terms to the Strategic Director of Place in consultation with other directors.

    Council website ↗

  • ...to procure and award a contract worth up to £63 million for electrical services to Havering Council homes and communal areas for a term of 10 years, with a possible 6-year extension, using a 50% Quality, 40% Price, and 10% Social Value weighting, and delegated the contract award and subsequent works packages.

    Council website ↗

  • 7 Year Cyclical Decorations Programme
    Recommendations Approved

    ...to award a seven-year, £20 million contract to Trident Maintenance Services Ltd for cyclical decorations and associated repairs in Housing Revenue Account (HRA) properties, pending satisfactory completion of leaseholder consultation.

    Council website ↗

  • Compliance Contracts Procurement
    Recommendations Approved

    ...to procure and award six 10-year contracts, potentially extendable by 6 years, with a maximum total value of £94,050,000, for safety inspections, building compliance checks, and related works for Havering's housing and corporate buildings, using a 50% Quality, 40% Price, and 10% Social Value weighting, and the Mercell procurement portal, delegating contract award approval and works ordering to specified officers.

    Council website ↗

  • ...to commence a tendering process for the replacement of the Havering Town Hall's roof, roof lanterns, parapet walls, and HVAC units, as well as the installation of photovoltaic panels, with a projected start date in June 2025 and completion in December 2025.

    Council website ↗

Attendees

Profile image for Councillor Barry Mugglestone
Councillor Barry Mugglestone Cabinet Member for Environment and Deputy Mayor of Havering • Havering Residents Association • Elm Park
Profile image for Councillor Oscar Ford
Councillor Oscar Ford Cabinet Member for Children and Young People • Havering Residents Association • Upminster
Profile image for Councillor Natasha Summers
Councillor Natasha Summers Cabinet Member for Climate Change and Housing Need • Havering Residents Association • South Hornchurch
Profile image for Councillor Ray Morgon
Councillor Ray Morgon Leader of the Council • Havering Residents Association • Hacton
Profile image for Councillor Paul Middleton
Councillor Paul Middleton Cabinet Member for Digital, Transformation and Customer Services • Havering Residents Association • St Andrews
Profile image for Councillor Gillian Ford
Councillor Gillian Ford Deputy Leader of the Council and Cabinet Member for Adults and Wellbeing • Havering Residents Association • Cranham
Profile image for Councillor Christopher Wilkins
Councillor Christopher Wilkins Cabinet Member for Finance • Havering Residents Association • Upminster
Profile image for Councillor Paul McGeary
Councillor Paul McGeary Cabinet Member for Housing and Property • Havering Residents Association • Gooshays
Profile image for Councillor Graham Williamson
Councillor Graham Williamson Cabinet Member for Regeneration • Havering Residents Association • South Hornchurch

Topics

No topics have been identified for this meeting yet.

Meeting Documents

Agenda

Agenda frontsheet 25th-Sep-2024 19.30 Cabinet.pdf
Agenda frontsheet 25th-Sep-2024 19.30 Cabinet.pdf

Reports Pack

Public reports pack 25th-Sep-2024 19.30 Cabinet.pdf
Public reports pack 25th-Sep-2024 19.30 Cabinet.pdf

Minutes

Printed minutes 25th-Sep-2024 19.30 Cabinet.pdf

Additional Documents

Compliance Contracts 20-08-24 v2.pdf
7 Year Decorations - Cabinet Report to Award V3.pdf
Appendix 3 - EqHIA - Cyclical Decorations.pdf
Cabinet Report - Large Complex Blocks and Street Retrofit 20-08-24.pdf
Cabinet Report - Electrical Services 20-08-24.docx.pdf
240909 Cabinet Report - Havering Town Hall roof replacement FINAL.pdf
Appendix 1 - 7 Year Decoration Evaluation.pdf
Appendix 2 - Lumensol Procurement Report - Cyclical Decorations.pdf
Roofing Renewals to HRA Properties 24-26 - Cabinet Report v2.docx.pdf
Cabinet Report - Large Complex Blocks and Street Retrofit 20-08-24.pdf
Compliance Contracts 20-08-24 v2.pdf
Appendix 3 - EqHIA - Cyclical Decorations.pdf
7 Year Decorations - Cabinet Report to Award V3.pdf
240909 Cabinet Report - Havering Town Hall roof replacement FINAL.pdf
Cabinet Report - Electrical Services 20-08-24.docx.pdf
Roofing Renewals to HRA Properties 24-26 - Cabinet Report v2.docx.pdf
Decisions 25th-Sep-2024 19.30 Cabinet.pdf
Appendix 1 - EqHIA - Large Complex Blocks and Street Retrofit Contracts.pdf
Appendix 1 - EqHIA - Compliance Contracts.pdf
Appendix 1 - EqHIA - Electrical Services.pdf
Appendix 1 - EqHIA - Roof Replacements.docx.pdf
Q1 2024-25 Cabinet Paper Draft V3.pdf
Decisions 25th-Sep-2024 19.30 Cabinet.pdf
Appendix 1 - EqHIA - Large Complex Blocks and Street Retrofit Contracts.pdf
Appendix 1 - EqHIA - Compliance Contracts.pdf
Q1 2024-25 Cabinet Paper Draft V4.pdf
Appendix 1 - EqHIA - Roof Replacements.docx.pdf
Appendix 1 - EqHIA - Electrical Services.pdf
Q1 2024-25 Cabinet Paper Draft V4.pdf