Consolidated Active Travel Fund (ATF6) correction

April 8, 2026 Executive Director of Transport (Officer) Approved View on council website

This summary is generated by AI from the council’s published record and supporting documents. Check the full council record and source link before relying on it.

Summary

The Executive Director of Transport decided on 08/04/2026 to rectify an error in a previous committee paper. This correction reclassified specific Active Travel Fund schemes from revenue to capital funding. The decision included rectifying the funding classification for the Temple Island Bath Bridges cycling and walking structure, Oldfield Park to Bear Flat pedestrian improvements, Twerton cycle/pedestrian route, Science Park to Parkway station improvements, and Staple Hill to Kingswood improvements.

Full council record

Decision

That the Executive Director of Transport:

1)    Rectifying the error within the July 2025 Committee paper regarding the below schemes being labeled as revenue funding instead of capital funding.

The impacted schemes are:

UA

Scheme name

Overview

Amount

BCC

Temple Island Bath Bridges cycling and walking structure?

Identify options on the A4 pinch point between Cattle Market Road and the Three Lamps junction by creating a new walking and cycling structure over the railway.

 £                          712,000

B&NES?

Oldfield Park to Bear Flat?

Pedestrian Improvements

 £                            100,000

B&NES?

Twerton cycle/pedestrian route?

Includes ped/cycle facilities at Twerton infants school, public realm improvements on Twerton High Street, link across A36 & segregated cycle facilities along A36 to Fieldings Bridge and possible north route to improve links to RUH and north of city.

 £                            100,000

SGC?

Science Park to Parkway station?

Improvements to existing cycle route to include side road priority, widening, lighting, resurfacing, speed limit reduction

 £                               50,000

SGC?

Staple Hill to Kingswood?

Removal of pinch points, prevention of footway parking, footway widening and improved crossing points

 £                               25,000

Supporting Documents

Transport Infrastructure Projects.pdf
Consolidated Active Travel Fund ATF6 correction.pdf

Details

OutcomeRecommendations Approved
Decision date8 Apr 2026